In the example the beam spans the 10 foot width of the roof.
2 x 4 roof overhang.
The vertical rise of the top chord per 12 horizontal inches is the roof pitch or slope.
Spacing than if it s 16 o c.
So the corner is supported by one 2 x4 located usually 2 to 4 ft in from the exterior wall and the rough fascias making for a weak spot you feel when you walk the roof.
Joe your problem is at the corner of the roof at the eaves.
They are essential for framing and shading windows reducing splashback and getting rain to fall far enough away from the foundation.
Gable trusses are only dropped over the area of the building not the overhang.
I m not an engineer but i believe this is due to the added weight of the overhang.
Two feet is the general maximum length for a typical roof overhang.
That makes absolutely no sense.
Roof overhangs can extend farther than 2 feet but beyond this length they begin to lose structural integrity and require external supports.
How can southern pine have less allowable overhang at 12 o c.
The table below shows common roof pitches and the equivalent grade degrees and radians for each.
Doing so keeps basements and crawlspaces dry and it also helps to.
Most roof s have a pitch in the 4 12 to 9 12 range.
F stands for the beam s fiber strength in bending which depends on the species of wood.
For example in the rafter span table below the highlighted cell in the 40 live load table indicates that 2 x 8 southern yellow pine joists that have a grade of 2 that are spaced 24 apart can have a maximum span of 10 feet 3 inches 10 3 if designing for a live load of 40 lbs ft 2.
For the initial calculation f can be estimated at 1 000.
For example 4 12 pitch means 4 inches of rise in 12 inches of run.
Does it mean to say 4 1 overhang at 12 o c.
Erick c 4 23 2017 11 47 00 pm reply.
The total load is 4 000 pounds.
This will protect a roof from most types of damage.
If the overhang extends beyond 24 inches say to 30 inches then a 2 6 top chord for the tail section will be required to handle the additional overhang.
Now the example formula is 4 000 1 000 bd 2 9 x 10.